2020 TRAFFIC ADVISORIES

ONGOING

​

South Capitol Detour Plan

​

Ramp 23 Closure Detour

​

Temporary Closure of Eastbound lanes of Potomac Avenue, SE at South Capitol St., SE August 8 to November 30, 2020

​

Temporary Closure of Eastbound lanes of Potomac Avenue, SE at South Capitol St., SE August 2 to November 30, 2020

​

Temporary Closure of Eastbound lanes of Potomac Avenue, SE at South Capitol St., SE July 22 to November 09, 2020

​

DECEMBER

DDOT Traffic Advisory: Temporary Closures on I-295 Northbound and Southbound December 21, 2020 - January 4, 2021

​

Temporary Lane Closures on Howard Road SE and Suitland Parkway SE Nightly from December 21, 2020 through January 4, 2021

​

DDOT Traffic Advisory: Temporary Closures on I-295 Northbound and Southbound December 28-31, 2020

​

DDOT Traffic Advisory: Temporary Closures on I-295 Northbound and Southbound December 21-24, 2020

​

The New Frederick Douglass Memorial Bridge Project - Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor December 24, 2020 - January 4, 2021

​

Temporary Closures of Suitland Parkway, SE December 11-14, 2020

​

Temporary Road Closure of Howard Road, SE under I-295 December 7-14, 2020

​

DDOT Traffic Advisory: Temporary Closures on I-295 Northbound and Southbound December 7-13, 2020

​

Malcolm X Interchange Project: Temporary Closures on I-295 Northbound and Southbound December 7-13, 2020

​

The New Frederick Douglass Memorial Bridge Project - Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor December 7-13, 2020

​

Continuous Single & Double Lane Closures Southbound I-295 December 1 - 7, 2020
Temporary Closures of Suitland Parkway, SE and Access Ramps from Southbound/Northbound I-295 December 3 - 7, 2020

​

Temporary Full Closure: Northbound South Capitol Street, SE Weekend of December 5-6, 2020 

​

Malcolm X Interchange Project: Temporary Closures on I-295 Northbound and Southbound November 30 - December 6, 2020

​

Temporary Road Closure of Howard Road, SE under I-295 November 23-24, November 29 - December 7, 2020

​

DDOT Traffic Advisory: Temporary Closures on I-295 Northbound and Southbound November 23 - December 7, 2020

​

NOVEMBER

​

Malcolm X Interchange Project: Temporary Closures on I-295 Northbound and Southbound November 23-29, 2020

​

The New Frederick Douglass Memorial Bridge Project - Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor November 23- December 7, 2020

​

Temporary Closures of Suitland Parkway, SE November 16-21, 2020

​

Temporary Road Closure of Howard Road, SE under I-295 November 16-21, 2020

​

DDOT Traffic Advisory: Temporary Closures on I-295 Northbound and Southbound November 16-22, 2020

​

Temporary Lane Closure: NB South Capitol Street, SE at Firth Sterling Ave., SE On/About November 19, 2020 

​

Temporary Full Closure: Northbound South Capitol Street, SE Weekend of November 21 - 22, 2020 

​

Malcolm X Interchange Project: Temporary Closures on I-295 Northbound and Southbound November 16-22, 2020

​

The New Frederick Douglass Memorial Bridge Project - Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor November 16-22, 2020

​

Temporary Closures of Suitland Parkway, SE November 9, 2020 – November 14, 2020

​

Temporary Road Closure of Howard Road, SE under I-295 November 9, 2020 – November 14, 2020

​

DDOT Traffic Advisory: Temporary Closures on I-295 Northbound and Southbound November 9-15, 2020

​

Malcolm X Interchange Project: Temporary Closures on I-295 Northbound and Southbound November 9 – November 15, 2020

​

The New Frederick Douglass Memorial Bridge Project - Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor November 9-15, 2020

​

 Temporary Closures of Suitland Parkway, SE November 2, 2020 – November 9, 2020

​

DDOT Traffic Advisory: Temporary Closures on I-295 Northbound and Southbound November 2-8, 2020

​

Temporary Lane Closure: Northbound South Capitol Street, SE November 14 to 15, 2020 and November 21 to 22, 2020

​

OCTOBER

​

Temporary Closures of Suitland Parkway, SE October 26, 2020 – November 02, 2020

​

DDOT Traffic Advisory: Temporary Closures on I-295 Northbound and Southbound October 26-November 1, 2020

​

Temporary Road Closure of Howard Road, SE under I-295 October 19-26, 2020

​

DDOT Traffic Advisory: Temporary Closures on I-295 Northbound and Southbound October 19-25, 2020

​

Temporary Lane Repurpose: South Capitol St., SE/SW, Potomac Avenue SW and O Street SW October 24, 2020

​

Temporary Closures of Suitland Parkway, SE October 12-17, 2020 

​

Temporary Road Closure of Howard Road, SE under I-295 October 12-17, 2020

​

DDOT Traffic Advisory: Temporary Closures on I-295 Northbound and Southbound October 12-17, 2020

​

Temporary Lane Repurpose: Potomac Avenue, SW and O Street, SW On/About October 17, 2020

​

Temporary Closures of Suitland Parkway, SE October 5-10, 2020

​

Temporary Road Closure of Howard Road, SE under I-295 October 5-10, 2020

​

DDOT Traffic Advisory: Temporary Closures on I-295 Northbound and Southbound October 5-10, 2020

​

SEPTEMBER

​

Temporary Closures of Suitland Parkway, SE September 14, 2020 – September 19, 2020

​

Temporary Road Closure of Howard Road, SE under I-295 September 20 to October 3, 2020

​

DDOT Traffic Advisory: Temporary Closures on I-295 Northbound and Southbound September 20-October 3, 2020

​

Malcolm X Interchange Project: Temporary Closures on I-295 Northbound and Southbound September 7-13, 2020

​

The New Frederick Douglass Memorial Bridge Project - Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor September 20 - October 3, 2020

​

Temporary Closures of Suitland Parkway, SE September 14, 2020 – September 19, 2020

​

Temporary Road Closure of Howard Road, SE under I-295 September 14 to September 19, 2020

​

DDOT Traffic Advisory: Temporary Closures on I-295 Northbound and Southbound September 13-19, 2020

​

Malcolm X Interchange Project: Temporary Closures on I-295 Northbound and Southbound September 7-13, 2020

​

The New Frederick Douglass Memorial Bridge Project - Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor September 13-19, 2020

​

Temporary Road Closure of Howard Road, SE under I-295 September 7 - 12, 2020 

​

DDOT Traffic Advisory: Temporary Closures on I-295 Northbound and Southbound September 6-12, 2020

​

Temporary Closures of Suitland Parkway, SE September 7– September 12, 2020

​

Malcolm X Interchange Project: Temporary Closures on I-295 Northbound and Southbound September 7-13, 2020

​

The New Frederick Douglass Memorial Bridge Project - Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor September 6-12, 2020

​

Temporary Road Closure of Howard Road, SE under I-295 August 31 to September 06, 2020

​

The New Frederick Douglass Memorial Bridge Project - Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor August 30-September 5, 2020

 

Malcolm X Interchange Project: Temporary Closures on I-295 Northbound and Southbound August 31-September 6, 2020

 

DDOT Traffic Advisory: Temporary Closures on I-295 Northbound and Southbound August 30 – September 5, 2020

​

AUGUST

​

Temporary Road Closure of Howard Road, SE under I-295 August 24 - 30, 2020

​

DDOT Traffic Advisory: Temporary Closures on I-295 Northbound and Southbound August 23 – 29, 2020

​

Malcolm X Interchange Project: Temporary Closures on I-295 Northbound and Southbound August 24-30, 2020

​

The New Frederick Douglass Memorial Bridge Project - Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor August 23-29, 2020

​

Temporary Road Closure of Howard Road, SE under I-295 August 17 - 23, 2020

​

DDOT Traffic Advisory: Temporary Closures on I-295 Northbound and Southbound August 16 – 22, 2020

​

Temporary Closures of Suitland Parkway, SE August 17, 2020 – August 23, 2020

​

The New Frederick Douglass Memorial Bridge Project - Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor August 16-22, 2020

​

DDOT Traffic Advisory: Temporary Closures on I-295 Northbound and Southbound August 17 – 23, 2020

​

Temporary Road Closure of Howard Road, SE under I-295 August 9 - 17, 2020

​

DDOT will temporarily close lanes, ramps and shoulders on the following roadways to perform construction activities along and near the I-295 / DC 295 corridor - August 9 - 15, 2020

​

Temporary Closures of Suitland Parkway, SE August 10, 2020 – 15, 2020 
Weeknights 8:00 PM to 5:00 AM, Saturday 5:00 AM to 9:00 PM

​

The New Frederick Douglass Memorial Bridge Project - Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor August 9-15, 2020

​

DDOT Traffic Advisory: Temporary Closures on I-295 Northbound and Southbound August 10 – 16, 2020

​

DDOT Traffic Advisory: Temporary Closures on I-295 Northbound and Southbound August 2-8, 2020

​

Temporary Closures of Suitland Parkway, SE August 3 - 8, 2020
Weeknights 8:00 PM to 5:00 AM Saturday 5:00 AM to 9:00 PM

​

Temporary Closures on I-295 Northbound and Southbound August 3 – August 9, 2020

​

The New Frederick Douglass Memorial Bridge Project - Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor August 2-8, 2020

​

JULY

 

DDOT Traffic Advisory: Temporary Closures on I-295 Northbound and Southbound July 26 – August 1, 2020

​

Temporary Closures of Suitland Parkway, SE July 27, 2020 – August 1, 2020 
Weeknights 8:00 PM to 5:00 AM, Saturday 5:00 AM to 9:00 PM

​

Permanent Closure of RAMP from EB Suitland Parkway to SB I-295 July 30, 2020

​

DDOT Traffic Advisory: Temporary Closures on I-295 Northbound and Southbound July 27 – August 2, 2020

​

The New Frederick Douglass Memorial Bridge Project - Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor July 26-August 1, 2020

​

Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor July 19-25, 2020

​

Temporary Closures of Suitland Parkway, SE July 20, 2020 – July 25, 2020

​

The New Frederick Douglass Memorial Bridge Project - Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor July 19-25, 2020

​

DDOT Traffic Advisory: Temporary Closures on I-295 Northbound and Southbound July 20 – July 26, 2020

 

Permanent Closure of I-295 Southbound Exit 4B to Howard Road SE July 15, 2020

​

Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor July 12-18, 2020

​

Temporary Closures of Suitland Parkway, SE July 13, 2020 – July 18, 2020, Weeknights 8:00 PM to 5:00 AM, Saturday 5:00 AM to 9:00 PM

​

Malcolm X Interchange Project: Temporary Closures on I-295 Northbound and Southbound July 13 – July 19, 2020

​

The New Frederick Douglass Memorial Bridge Project - Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor June 12 - July 18, 2020

​

I-295 Ramp to Howard Road Closure for New Frederick Douglass Memorial Bridge Project Starting Mid-to-Late July 2020

​

Temporary Closures of Suitland Parkway, SE July 6, 2020 – July 11, 2020 Weeknights 8:00 PM to 5:00 AM, Saturday 5:00 AM to 9:00 PM

​

Permanent Closure of I-295 Southbound Exit 4B to Howard Road SE July 10, 2020

​

Temporary Closures on I-295 Northbound and Southbound July 6 – July 12, 2020

​

Temporary Closures of Suitland Parkway, SE June 29, 2020 through July 2, 2020

​

Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor June 28 - July 4, 2020

​

Malcolm X Interchange Project - Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor June 29 – July 5, 2020

​

The New Frederick Douglass Memorial Bridge Project - Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor June 28 - July 4, 2020

​

JUNE

​

New Route to WMATA Park & Ride - I-295 Ramp to Howard Road Closure for New Frederick Douglass Memorial Bridge Project Starting mid-to-late July, 2020

​

Temporary Closures of Suitland Parkway, SE June 22, 2020 through June 28, 2020

​

Temporary Road Closure of Howard Road, SE under I-295 June 27, 2020 

​

Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor June 21-27, 2020

​

Malcolm X Interchange Project - Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor June 22-June 28, 2020

​

The New Frederick Douglass Memorial Bridge Project - Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor June 21-27, 2020

​

 Temporary Closures of Suitland Parkway, SE June 15, 2020 through June 21, 2020 

​

 Temporary Closure of South Capitol Street, SW June 12, 2020 – July 3, 2020 

​

Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor June 14-20, 2020

​

Malcolm X Interchange Project - Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor June 15-June 22, 2020

​

The New Frederick Douglass Memorial Bridge Project - Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor June 14-20, 2020

​

Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor June 7-13, 2020

​

The New Frederick Douglass Memorial Bridge Project - Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor June 7-13, 2020

​

Suitland Parkway, SE Temporary Closure June 1 - June 27, 2020

​

Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor May 31-June 6, 2020

​

Malcolm X Interchange Project - Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor June 1-June 7, 2020

​

The New Frederick Douglass Memorial Bridge Project - Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor May 31-June 6, 2020

​

MAY

 

Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor May 24-30, 2020

​

Malcolm X Interchange Project - Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor May 26-31, 2020

​

The New Frederick Douglass Memorial Bridge Project - Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor May 24-30, 2020

​

Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor May 17-23, 2020

​

Suitland Parkway, SE Temporary Closure May 16 & May 30, 2020

​

Malcolm X Interchange Project - Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor May 18-31, 2020

​

The New Frederick Douglass Memorial Bridge Project - Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor May 17-23, 2020

​

Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor May 10-16, 2020

​

Malcolm X Interchange Project - Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor May 11-17, 2020

​

The New Frederick Douglass Memorial Bridge Project - Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor May 10-16, 2020

​

Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor May 3-9, 2020

​

Malcolm X Interchange Project - Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor May 4-10, 2020

​

The New Frederick Douglass Memorial Bridge Project - Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor May 3-9, 2020

​

Temporary Lane Closure on East Capitol Street Bridge to Continue Through May 23

​

Temporary Closures April 30, 2020 - May 18, 2020 

​

Malcolm X Interchange Project - Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor April 27-May 17, 2020

​

​

APRIL

 

Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor April 26-May 2, 2020

​

The New Frederick Douglass Memorial Bridge Project - Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor April 26-May 2, 2020

​

Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor April 19-25, 2020

​

Malcolm X Interchange Project - Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor April 20-26, 2020

​

The New Frederick Douglass Memorial Bridge Project - Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor April 19-25, 2020

​

DDOT will shift the traffic pattern on I-295 southbound at the ramp to Exit 4A Suitland Parkway / JBAB on or about Sunday, April 19, 2020, Exit 4A traffic will shift onto the new roadway bridge, approximately 1,000 feet before the existing exit ramp

​

Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor April 12-18, 2020

​

Malcolm X Interchange Project - Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor April 13-19, 2020

​

Temporary Closure of Suitland Parkway, SE April 18, 2020

​

The New Frederick Douglass Memorial Bridge Project - Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor April 12-18, 2020

​

Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor April 6-12, 2020

​

Temporary Closure of Suitland Parkway, SE April 4, 2020

​

Malcolm X Interchange Project - Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor April 6-12, 2020

​

The New Frederick Douglass Memorial Bridge Project - Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor April 6-12, 2020

​

Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor March 30-April 5, 2020

​

The New Frederick Douglass Memorial Bridge Project - Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor March 30-April 5, 2020

​

​

MARCH

​

The District Department of Transportation (DDOT) will temporarily close Suitland Parkway, SE between South Capitol Street, SE/SW and Firth Sterling Avenue, SE from 5:00 am to 7:00 pm, on Saturday, March 28, 2020 for bridge reconstruction

​

Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor March 23-29, 2020

​

Malcolm X Interchange Project - Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor March 23 - March 28, 2020

​

The New Frederick Douglass Memorial Bridge Project - Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor March 23-March 29, 2020

​

Malcolm X Interchange Project - Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor March 16 - March 22, 2020

​

Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor March 16-22, 2020

​

The New Frederick Douglass Memorial Bridge Project - Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor March 16-March 22, 2020

​

Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor March 9-15, 2020

​

The New Frederick Douglass Memorial Bridge Project - Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor March 9-March 15, 2020

​

Malcolm X Interchange Project - Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor March 9 - March 15, 2020

​

Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor March 2-8, 2020

​

The New Frederick Douglass Memorial Bridge Project - Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor March 2-March 8, 2020

​

Malcolm X Interchange Project - Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor March 2 - March 8, 2020

​

The District Department of Transportation (DDOT) will change the traffic pattern on inbound Suitland Parkway, SE and South Capitol Street, SE between Howard Road, SE and the Frederick Douglass Memorial Bridge on or about February 29, 2020 for an extended period

​

Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor February 24 - March 1, 2020

​

The New Frederick Douglass Memorial Bridge Project - Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor February 24 - March 1, 2020

​

​

FEBRUARY

​

Malcolm X Interchange Project - Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor February 24 - March 1, 2020

​

Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor February 16 - February 22, 2020

​

The New Frederick Douglass Memorial Bridge Project - Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor February 16 - February 22, 2020

​

Malcolm X Interchange Project - Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor February 18 - February 23, 2020

​

Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor February 10 - February 16, 2020

​

The New Frederick Douglass Memorial Bridge Project - Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor February 10 - February 16, 2020

​

Malcolm X Interchange Project - Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor February 10 - February 15, 2020

​

Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor February 3 - February 9, 2020

​

The New Frederick Douglass Memorial Bridge Project - Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor February 3 - February 9, 2020

​

Malcolm X Interchange Project - Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor February 3 - February 9, 2020

​

Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor January 27-February 2, 2020

​

The New Frederick Douglass Memorial Bridge Project - Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor January 27-February 2, 2020

​

Malcolm X Interchange Project - Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor January 27-February 2, 2020

​

​

JANUARY

​

Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor January 21-January 26, 2020

​

The New Frederick Douglass Memorial Bridge Project - Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor January 21-January 26, 2020

​

Malcolm X Interchange Project - Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor January 21-January 26, 2020

​

Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor January 13-January 19, 2020

​

The New Frederick Douglass Memorial Bridge Project - Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor January 13-January 19, 2020

​

Malcolm X Interchange Project - Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor January 13-January 19, 2020

​

Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor January 6-January 12, 2020

​

The New Frederick Douglass Memorial Bridge Project - Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor January 6-January 12, 2020

​

Malcolm X Interchange Project - Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor January 6-January 12, 2020

​

Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor December 29, 2019-January 4, 2020

​

The New Frederick Douglass Memorial Bridge Project - Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor December 29, 2019-January 4, 2020

​

Malcolm X Interchange Project - Temporarily Closed Lanes, Ramps and Shoulders on the Following Roadways to Perform Construction Activities Along and Near the I-295 / DC 295 Corridor December 30 2019-January 5, 2020

bottom of page